Type Here to Get Search Results !

Material to Material Transfer | Standard Price | SAP MM

 Material to Material Transfer | Standard Price

Material to Material Transfer Movement Type 309

Created two Materials 

Material: L230

Material: L231

Standard Price for L230 is 100 INR.

Standard Price for L231 is 200 INR.


Step 1

Check Stock overview for Material L230

Transaction Code : MMBE

Batch: STD1


Check Stock overview for Material L231

Transaction Code : MMBE

Batch: STD2(existing)


Step 2

Now, Transfer from Material L230 to Material L231 10 Pcs.

Batch STD1 to Batch STD2 10 Pcs.

Material L230

Standard Price 100 INR

Stock 100

Total Value 10000 INR.

Material L231

Standard Price 200 INR

Stock 100

Total Value 20000 INR.

Now, Go to Transaction code MB1B


Click on Enter

Now, Enter Required Details

Receiving Plant: LU4

Receiving Sloc: ECIL

Receiving Material: L231


Enter here

Issuing Material : L230

Issuing plant : LU4

Issuing Sloc: ECIL

Quantity: 10

Batch: STD1

Click on enter.

System By default shows Receiving Batch: STD1 change it to STD2.



Click on Enter.

system response STD2 already exist in L231.


Click on enter.

Click on Save.



Document successfully posted.

Step 3

Click on Transfer posting and click on Display.

Check FI Documents


Click on Accounting document


Step 4

Check Stock Overview

Transaction code MMBE


Material: L230

Batch: STD1

100 - 10 = 90


Material: L231

Batch: STD2

100 + 10 = 110.

Step 5

Go to transaction code MM03 to Display Material


Material L230 is "S" price control

Stock is valuated at 100 x 90 = 9000 INR.

Material L230

(100 x 100) - (10 x 100) / 100 - 10

(10000 - 1000) / 90

9000 / 90

New MAP 100 INR / pc.


Material L231 is "S" Price control

Stock is valuated at 200 x 110 = 22000 INR.

Material L231

(100 x 200) + ( 10 x 100) / 100 + 10

= ( 20000 + 1000) / 110

= 21000 / 110

=  190.91 INR

New moving average price is 190.91 INR / pc.

Step 6

Now, we transfer L231 to L230

Keep in mind

L231 STD 200 INR(from higher value to lover value item)

L230 STD 100 INR

Example

we will use MIGO to perform the transfer posting.


Material L230

Batch STD1: 90

Material L231

Batch STD2: 110.

Now transfer Material L231 to L230 50Pcs

Batch STD2(existing) to Batch STD3.

Step 7

Go to T.code : MIGO

Select Transfer posting.

Enter

From to destination details

Material : L231

Plant: LU4

Sloc: ECIL

Destination

Material : L230

Plant: LU4

Sloc: ECIL

Quantity: 50

Click on Enter.


Enter

Batch : STD2

Batch: STD3

Click on check


Click on Save.



Document successfully Posted.

Step 8

Display Material Document and check FI Documents.



Step 9

Check stock overview MMBE

Material : L230

Batch STD1 100 - 10 = 90

Batch STD3 +50


Material : L231

Batch STD1 100 + 10 - 50 = 60.


Step 10

Go to T.code MM03

Display Material L230


Material L230 is "S" Price control

Stock is valuated at 100 x 140 = 1400 INR

Material L230

use before transfer MAP price.

(90 X 100) + (50 x 200) / 90 + 50

= (9000 + 10000) / 140

= 135.71 INR / PC.

Display Material L231


Material L231 is "S" Price control

Stock is valuated at 200 x 60 = 12000 INR

Material L231

use before transfer MAP price.

(110 x 190.91) - (50 x 190.91) / 110 - 50

= (21000.5 - 9545.5) / 60

= 11455 / 60

= 190.91 INR

Post a Comment

0 Comments
* Please Don't Spam Here. All the Comments are Reviewed by Admin.